Renewal of Vibration Analysis CATII




We installed in January a 5.85kW hybrid system with (2) 100Ah/ 48V batteries. Now that I think about it, the number of modules charging the batteries is a bit inadequate but it can't be helped due to lack of roof space. And to think even further, I
Starting Nov we were contracted with inspecting 120 stores. The first 20 stores were inspected with Choy and myself and the other 40 by me and Bop. Through our experience for each store we've continued to refine our techniques and data gathering. Interesting Finds This is one instance
If you go up a cooling tower, its best to not go alone. There are 6 cooling towers. Cooling Tower #1 is redudancy and Cooling Tower 6 had a blade that failed due to unbalance. So 4 cooling towers are in operations all the time. We had a discussion to