Reliability Practitioner in the Philippines
  • Home
  • About
Sign in Subscribe

Renewal of Vibration Analysis CATII

Thomas Okamura

Thomas Okamura

17 Oct 2025

Read more

The Automatic Transfer Switch Issue in our Hybrid Solar PV setup

The Automatic Transfer Switch Issue in our Hybrid Solar PV setup

We installed in January a 5.85kW hybrid system with (2) 100Ah/ 48V batteries. Now that I think about it, the number of modules charging the batteries is a bit inadequate but it can't be helped due to lack of roof space. And to think even further, I

By Thomas Okamura 24 Feb 2026
Thermography for MR DIY 12.26.2025

Thermography for MR DIY 12.26.2025

Starting Nov we were contracted with inspecting 120 stores. The first 20 stores were inspected with Choy and myself and the other 40 by me and Bop. Through our experience for each store we've continued to refine our techniques and data gathering. Interesting Finds This is one instance

By Thomas Okamura 29 Dec 2025
Cooling Tower Inspection

Cooling Tower Inspection

If you go up a cooling tower, its best to not go alone. There are 6 cooling towers. Cooling Tower #1 is redudancy and Cooling Tower 6 had a blade that failed due to unbalance. So 4 cooling towers are in operations all the time. We had a discussion to

By Thomas Okamura 16 Oct 2025
Essential Technical Books for me

Essential Technical Books for me

By Thomas Okamura 05 Oct 2025
Reliability Practitioner in the Philippines
  • Sign up
Powered by Ghost

Reliability Practitioner in the Philippines

Thoughts, stories and ideas.